Apollo Beach Marine Youth
- Site development and construction of Marine Youth Education Center on TECO power plant property.
- Elevated building construction.
- New site lighting, power and telephone services.
- Multi use building with conference rooms, classrooms and offices.
CENTRA CARE
- Site development and ground up construction of Urgent Care Clinics.
- Modify existing site utilities to allow for new building.
- Complete interior build outs.
- New electrical and communication services.
- ESG has completed 3 locations in the Tampa metro.
Keke’s
- Retail/ Food service build out of existing space.
- Modify existing building utilities to new tenant design.
- Develop interior lighting package to suit customer’s requirements.
- Coordinate electrical installation of new commercial kitchen.
Mease Memory Care
- Ground up construction of 32 unit Memory Care Facility.
- Partnered with SAI systems to install addressable fire alarm system.
- Installed 250KW generator for emergency backup.
- Worked with owner to install variety of owner supplied fixtures.
- New LED lighting products throughout site.
Lakeland Fire Station
- Construction of new Fire Station in Lakeland.
- Install new 150KW emergency generator.
- Installed new site lighting.
- Integrated lighting controls with building automation systems.
SPC Midtown College
- Ground up construction of 3 story educational building for SPC.
- Installed emergency generator, site lighting, code blue emergency call stations.
- Coordinated Install of 4G wireless repeater system.
- State of the art lighting control systems with full integration to building automation systems.
- Coordinated installation of normal, emergency and life safety power throughout building.
- Included Luma- stream lighting package featuring 12 volt LED downlighting throughout.
Tampa Sports Academy
- Installed new site lighting, building accent lighting and completed interior build out.
- Ground up construction of multi- use building in South Tampa.
- Worked with customer through continued design and use changes during construction.
The Learning Experience
- Ground up site development and construction of new day care/ educational facility.
- Included new site lighting, electrical, lift station and interior build out.
- Coordinated with National Account Vendors to complete fire alarm and security systems.